Radiology Fitout at Liverpool Hospital CT and Control Room
GE Healthcare Australia Pty Limited were contracted to Liverpool Hospital to provide them with a new CT machine and room. Cassins performed the radiological fitout to the room. Works included:
- Site investigations, preparation, drilling, removal of floor covering, cement topping and ramping of floor
- Installation of lead shielding for walls and double doors
- Install plasterboard linings over lead shielding and painting walls
- Vinyl flooring to CT and Control rooms
- Build open shelving units
- Electrical and air conditioning upgrades
About The Client
GE Healthcare Australia Pty Ltd for Liverpool Hospital
2018