Renovations to Dental Surgery for Green Valley Dental Orthodontics
Works started with demolition of existing floor coverings and partitions and excavation of slab and earth for drainage connections. Works then consisted of ceilings, partitions, electrical, finishes, plumbing, air conditioning and relocation of client’s existing lab. Joinery was manufactured and installed by our own team of cabinet makers.
About The Client
Green Valley Dental Orthodontics
January 2017
- Demolition of existing floor coverings and partitions
- Excavation of slab and earth for drainage connections
- Ceilings, partitions, electrical, finishes, plumbing, air conditioning
- Relocation of client’s existing lab
- Joinery was manufactured and installed by our own team